Twilight switch for distribution board

line
Product category:
Twilight switch for distribution board
Brand:
Rated voltage(V):
Rated frequency(Hz):
Max. incandescent lamp load(W):
Max. load fluorescent lamp(VA):
Max. load fluorescent lamp (Duo circuit)(VA):
Max. load fluorescent lamp (parallel compensated)(VA):
Max. switching current (cos phi = 0.6)(A):
Rated switch current(A):
Adjustment range brightness value(lx):
With programmable overnight shutoff:
Push button input:
Rated voltage light sensor(V):
Max. conductor length light sensor(m):
Protection class light sensor:
Mounting method light sensor:
Mounting method:
Width in number of modular spacings:
Built-in depth(mm):
Degree of protection (IP):
Degree of protection (IP) light sensor:
Material:
Colour:
Max. switching power LED(W):

Results 1 - 10 (of 26)

line
Legrand 412623 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Hager EEN100 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 6 days.


Quantity items
Add to cart
Finder 11.31.8.230.0000 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.41.8.230.0000 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.42.8.230.0000 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.91.8.230.0000 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.31.0.024.0000 Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.31.8.230.0000POA Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.41.8.230.0000POA Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Finder 11.91.8.230.0000POA Twilight switch for distribution board
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart