Safety multiple beam light curtain

line
Product category:
Multiple beam light curtain
Brand:
Number of semiconductor outputs with signalling function:
Number of contact energized outputs with signalling function:
Number of protected semiconductor outputs:
Number of protected contact energized outputs:
Number of beams:
Width(mm):
Model:
Type of interface for safety communication:
Type of electric connection:
Type of switching output of the OSSD:
Detection capability for test bodies(mm):
Scope of delivery of the one-way system:
Max. output current at protected output(mA):
Response time(ms):
Transmission range of the safety field(m):
Switching voltage of OSSD at state "high"(V):
Voltage type:
Beam spacing(mm):
Ambient temperature(°C):
Wavelength of the sensor(nm):
Cascadable:
With muting function:
With beam coding:
With monitoring function downstream switching devices:
With restart blockage:
Override possible:
Pre failure notice:
Condition analysis system:
Height(mm):
Length(mm):
Operation agent-safety class:
Explosion safety category for gas:
Explosion safety category for dust:
Type of safety according to IEC 61496-1:

Results 1 - 10 (of 407)

line
Pilz 630728 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 12 days.


Quantity items
Add to cart
Sick 1200061 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Sick 1200064 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 9 days.


Quantity items
Add to cart
Sick 1200125 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
Pilz 630721 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 12 days.


Quantity items
Add to cart
Sick 1200131 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
Sick 1200124 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
Pilz 631151 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 12 days.


Quantity items
Add to cart
Sick 1200025 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 10 days.


Quantity items
Add to cart
Sick 1200008 Multiple beam light curtain
Stock: 0.
  Estimated lead time: 10 days.


Quantity items
Add to cart