Pedestal

line
Product category:
Base/base element (enclosure/cabinet)
Brand:
Model:
Material:
Colour:
Width(mm):
Height(mm):
Depth(mm):
Suitable for enclosure building width(mm):
Suitable for enclosure building depth(mm):
Suitable for aeration/de-aeration:
Suitable for outdoor set-up:
Suitable for cable patch:
RAL-number:
Max. load capacity(kg):
RAL-number (similar):
Impact strength:
Suitable for outdoor installation:

Results 1 - 10 (of 1020)

line
Rittal 5301325 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 16 days.


Quantity items
Add to cart
Schneider Electric NSYSPLVX6200 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Schneider Electric NSYSPSX8100SF Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Schneider Electric NSYSPSX8200SF Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 7 days.


Quantity items
Add to cart
Schneider Electric SZU420 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 20 days.


Quantity items
Add to cart
Rittal 4051124 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 22 days.


Quantity items
Add to cart
Schneider Electric LVS01052 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 11 days.


Quantity items
Add to cart
Schneider Electric LVS01053 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 11 days.


Quantity items
Add to cart
ABB Components 4TBE843144R0100 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 44 days.


Quantity items
Add to cart
ABB Components 4TBE843390N0100 Base/base element (enclosure/cabinet)
Stock: 0.
  Estimated lead time: 44 days.


Quantity items
Add to cart