Changeover switch

line
Product category:
Off-load switch
Brand:
Model:
Number of poles:
With zero (off) position:
Rated permanent current Iu(A):
Rated operation power at AC-3, 400 V(kW):
Degree of protection (IP), front side:
Number of auxiliary contacts as normally closed contact:
Number of auxiliary contacts as normally open contact:
Number of auxiliary contacts as change-over contact:
Suitable for floor mounting:
Suitable for front mounting:
Suitable for distribution board installation:
Suitable for intermediate mounting:
Complete device in housing:
Type of control element:
Type of electrical connection of main circuit:
With retraction in 0-position:
Rated operation current Ie at AC-3, 400 V(A):
Degree of protection (NEMA), front side:
Material housing:
Suitable for floor mounting:
Suitable for front mounting:

Results 1 - 10 (of 1248)

line
ABB Components 2CCA703025R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703026R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703030R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703031R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703040R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703041R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703045R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
ABB Components 2CCA703046R0001 Off-load switch
Stock: 0.
  Estimated lead time: 8 days.


Quantity items
Add to cart
Schneider Electric K10B002ACH Off-load switch
Stock: 0.
  Estimated lead time: 10 days.


Quantity items
Add to cart
Schneider Electric K10B002QCH Off-load switch
Stock: 0.
  Estimated lead time: 10 days.


Quantity items
Add to cart